Latest News, Projects & Stories from Collett


All the latest news from Collett, our highlighted haulage projects & heavy lift operations, and stories to shout about.

Paired Girders for Newhaven Access Road

Our Team deliver 44m paired girders for the Newhaven Port access road.

Paired Girders for Newhaven Port Access Road

Utilising our fleet of ballasted heavy tractors and modular trailers configured as double bogies, the Collett Team deliver the first three 44m paired girders for the Newhaven Port Access Road Project.

Travelling from their point of manufacture at Cleveland Bridge UK Darlington facility, each of the three loads made the 323 mile trip to the BAM Nuttall site in Newhaven.

The 44m long cargoes required extensive swept path analysis reports ahead of the movement to ensure each of the lengthy cargoes could safely navigate the route.  Utilising hydraulic trailer capabilities, our Team expertly navigated the roundabouts, twists and turns from Darlington to Newhaven.

Collett Deliver Paired Girders for Newhaven Port Access Road

Work has now begun on site to complete the Newhaven Port Access Road Project with a bridge over the Newhaven – Seaford railway line and Mill Creek, ultimately linking into the East Quay area. Construction is now underway and is expected to be complete in 2020.

More News Stories

Contact Us

Tel. +44 (0)8456 255 233
Email. info@collett.co.uk

Victoria Terminal, Albert Road, Halifax, HX2 0DF
Mistral Point, AW Nielsen Road, Goole, DN14 6UE
Baltic House, Central Dock Road, Grangemouth, FK3 8TY
Naas Industrial Estate, Naas, Co. Kildare, W91 VR8E

DMC Firewall is developed by Dean Marshall Consultancy Ltd

We use cookies to enhance the content of our website and your browsing experience.