HS2 (High-Speed 2) Rail Development

Collett are committed to delivering transport and logistics solutions for the development of HS2, the high-speed rail network connecting London, Birmingham, Manchester and Leeds.

HS2 Construction & Infrastructure

Committed to Delivering High-Speed 2 Rail

As Prime Minister, Boris Johnson, confirms the development of HS2 (High-Speed 2) rail network, Collett are perfectly placed to assist in the delivery of the HS2 vision.


With HS2 applying the best in worldwide design and construction, Collett's award winning transport and logistics services provide the ideal solution for the necessary infrastructure required to deliver the project.

Our Companies Management Systems are UKAS Accredited against ISO 9001:2015, ISO 14001:2015, ISO 27001:2013 and ISO 45011:2015 for 'The provision of general transport, abnormal indivisible load movements and heavy lifting logistics to all industry sectors in the UK and Europe.' These safety and quality accreditations provide peace of mind for our customers.

Our wealth of experience allows the Collett Team to manage all transport projects from initial engineering studies, detailed calculations and specialist reporting through to any heavy lift requirements and final delivery. This includes engineering drawings including geometrical tolerancing to BS8888:2017 Standards, and working under CDM2015 Regulations to BS5975:2018 Standards for temporary works.

Collett Transport Solutions for HS2 Rail

Infrastructure & Construction of High-Speed 2

From rolling stock, construction, rail systems and infrastructure projects, Collett are perfectly placed with the specialist transport equipment to facilitate the vast quantities of cargo required.  Utilising our 22 acres of storage space across our heavy lift Depots, coupled with our expansive fleet of specialist vehicles and trailers, our Team can accommodate general haulage and heavy transport requirements across the UK.

HS2 is at the forefront of infrastructure development, delivering new standards of construction to link nearly half the UK population with 345 miles of high-speed rail network.  Our expertise in transport and logistics is essential to this development.

From general haulage, project management, heavy transport, warehousing and heavy lift operations, the Collett Team can provide a full logistics and handling service. 

With our vast experience in construction and our expertise in the transport field, Collett are committed to playing a key part in this development and delivering HS2 to the United Kingdom.

Contact Us

Tel. +44 (0)8456 255 233
Email. info@collett.co.uk

Victoria Terminal, Albert Road, Halifax, HX2 0DF
Mistral Point, AW Nielsen Road, Goole, DN14 6UE
Baltic House, Central Dock Road, Grangemouth, FK3 8TY
Naas Industrial Estate, Naas, Co. Kildare, W91 VR8E

Our website is protected by DMC Firewall!

We use cookies to enhance the content of our website and your browsing experience.